How to Get to 275 Merton Street, Toronto
By Transit
The site is well served by TTC subway and bus routes.
Davisville Station (Line 1 – Yonge–University) is approximately 850 m (11-minute walk) from the site.
Nearby TTC bus routes operate along Mount Pleasant Road, Davisville Avenue, and Yonge Street, with stops within a 2–10 minute walk.
Walking & Cycling
Continuous sidewalks are provided along Merton Street and surrounding streets.
Signalized and pedestrian-activated crossings are located nearby.
The Kay Gardner Beltline Trail is directly south of the site, providing an accessible east–west walking and cycling route.
Secure bicycle parking will be provided on site, with step-free access.
By Car & Drop-Off
Vehicle access is provided from Merton Street.
A designated pick-up/drop-off area will be available on the east side of the site.
Accessible parking spaces will be provided within the underground garage.
Accessibility
The primary entrance is step-free and connected to public sidewalks.
Exterior pathways and entrances are designed to support barrier-free access.