How to Get to 275 Merton Street, Toronto

 

By Transit

The site is well served by TTC subway and bus routes.

  • Davisville Station (Line 1 – Yonge–University) is approximately 850 m (11-minute walk) from the site.

  • Nearby TTC bus routes operate along Mount Pleasant Road, Davisville Avenue, and Yonge Street, with stops within a 2–10 minute walk.

Walking & Cycling

  • Continuous sidewalks are provided along Merton Street and surrounding streets.

  • Signalized and pedestrian-activated crossings are located nearby.

  • The Kay Gardner Beltline Trail is directly south of the site, providing an accessible east–west walking and cycling route.

  • Secure bicycle parking will be provided on site, with step-free access.

By Car & Drop-Off

  • Vehicle access is provided from Merton Street.

  • A designated pick-up/drop-off area will be available on the east side of the site.

  • Accessible parking spaces will be provided within the underground garage.

Accessibility

  • The primary entrance is step-free and connected to public sidewalks.

  • Exterior pathways and entrances are designed to support barrier-free access.